Proposed Georgia's State Implementation Plan for the Macon PM 2.5 Nonattainment Area

Narrative

Appendix A, Justification for Modification to State Recommendations, PM2.5 Nonattainment Areas, State of Georgia
Appendix B, PM2.5 Source Apportionment at Georgia STN Sites Using Positive Matrix Factorization
Appendix C, PM2.5 Source Apportionment in Georgia
Appendix D, Characterization of Meteorology and Its Relationships to Fine Particulate Mass and Visibility in the VISTAS Region
Appendix E.1, Insignificance of NH3, VOCs, and NOx to PM2.5 Attainment in Georgia Nonattainment Areas
Appendix E.2, NOx Insignificance Sub-Appendix
Appendix F, Modeling Protocol For Association for Southeastern Integrated Planning (ASIP) Emissions and Air Quality Modeling to Address 8-Hour Ozone and PM2.5 Nonattainment in the Southeastern United States
Appendix G, Technical Support Document for Association for Southeastern Integrated Planning (ASIP) Emissions and Air Quality Modeling to Support PM2.5 State Implementation Plans
Appendix H, Documentation of the Base G2 and Best & Final 2002 Base Year, 2009 and 2018 Emission Inventories for VISTAS
Appendix I.1, Emissions Inventories - State of Georgia (Excel format)
Appendix I.2, Georgia Tier Emission Summary
Appendix J, Mobile Source Emissions Modeling for Macon PM2.5 Attainment Demonstration Motor Vehicle Emissions Budgets
Appendix K.1, Model Performance Evaluation, VISTAS Meteorology Report
Appendix K.2, Model Performance Evaluation, Georgia Meteorological Modeling Evaluation
Appendix K.3, Model Performance Evaluation, CMAQ Model Performance in Georgia and Macon
Appendix L, Multipollutant Control for Electric Utility Steam Generating Units (Georgia Rule 391-3-1-.02(2)(sss))
Appendix M.1, Attainment Demonstration Calculations and Results, Stacked Bar Chart Design Value Comparisons (Excel format)
Appendix M.2, Attainment Demonstration Calculations and Results, VISTAS 12-Kilometer FRM PM Projections (Excel format)
Appendix M.3, Attainment Demonstration Calculations and Results, VISTAS 36-Kilometer FRM PM Projections (Excel format)
Appendix N, CAA Section 110(a)(2) Requirements (SIP Infrastructure Elements): Communications dated 7-23-08 and 9-22-08